Several shops and facilities to which we provide preventive maintenance services, corrective and remodeling a total of approximately 8,500 TONS.
Barra Freeway, Barra (nº 1335, 1668 e 1679), Campo Grande I e II, Taquara I, II e III, Recreio, Bangu, Campinho, São Conrado, Freguesia, Vila Valqueire, Praça Seca, Santa Cruz..
Extra Boulevard, Extra Mariz e Barros, Extra Maracanã, Extra Pilares, Grajaú, Satamini, São Cristóvão, Méier e Meier I, Tijuca I, Vila Isabel, Bairro de Fátima, Rio Comprido, Engenho Novo, Conde de Bonfim.
- Bradesco
- Banco do Brasil
- CEF - Caixa Econômica Federal
- Citibank
- Unibanco
- BANERJ
- Banco Santos
- Banco Boavista
Air conditioning system, ventilation and mechanical exhaust.
Analysis inside air conditioning systems, customized modifications to improve yields.
Air conditioning system, ventilation and mechanical exhaust.
Air conditioning system, ventilation and mechanical exhaust.
Central air conditioning system installation.
Central air conditioning system installation.
Air conditioning system, ventilation and mechanical exhaust.
Air conditioning system, ventilation and mechanical exhaust.
Air conditioning system, ventilation and mechanical exhaust.
Air conditioning system, ventilation and mechanical exhaust.
- LOJAS AMERICANAS - Branches: Niterói, Votuporanga, Laranjeiras, Vitória
- CASA E VÍDEO: Vitória / ES
- MADUREIRA SHOPPING (diverse)
- RIO OFF PRICE (diverse)
- RIO SUL SHOPPING (diverse)
- SÃO CONRADO FASHION MALL (diverse)
- SHOPPING BARRA SQUARE (diverse)
- SHOPPING IGUATEMI (diverse)
- SHOPPING CENTER TIJUCA (diverse)
- SHOPPING BARRA GARDEN (diverse)
Projects and facilities of cold water, ventilation and mechanical exhaust with special filtering within Hospital Standards for care of emergency areas, Clean Rooms, MRI and CT rooms and Manufacturing Areas of Medical and Hospital Products.
- HOSPITAL SALGADO FILHO, Rio de Janeiro City
- MAIOLINO Laboratories (Ilha do Governador and Praça da Bandeira branches)
- Associação Promatre
- HOSPITAL Espanhol
- Cardiolab
- CLINICA QUALIMAGEM
- SILIMED
- Clínica Veterinária Jardim Botânico
- ONCOTECH - ONCOLOGY CLINIC – Tijuca, Rio de Janeiro
- CT - SCAN DIAGNOSTIC CENTER – Gloria, Rio de Janeiro
- CTTB - BOTAFOGO TUMORS TREATMENT CENTER
- HOSPITAL CLIMEDE
- CLINIC ONCOVIDA
- HERF - HOSPITAL ROCHA FARIA, Rio de Janeiro State
- BRAIN HOSPITAL PAULO NIEMEYER, Rio de Janeiro State
- INTO, Federal Ortopedics and Traumatology Federal Hospital, federal reference hospital
Design and central air conditioning system installation, with indirect expansion, consisting of clean rooms, operating rooms, ICU, outpatient, etc - chilled water system capacity 750 TONS
MSTC Engenharia was contracted in 2016 to perform the preventive and corrective maintenance of the air conditioning, ventilation and mechanical exhaustion equipments of the Marriott Hotel in Porto Maravilha, Centro / RJ. The air conditioner is of the direct expansion type, through Midea Carrier brand of variable refrigerant (VRV) air condensing volume, in a cooling capacity of about 500 HP (400 TR).
MSTC Engenharia was contracted in 2017 to perform the preventive and corrective maintenance of the air conditioning, ventilation and mechanical exhaustion equipments of the Vista Mauá Building, Centro / RJ. The air conditioner is of the direct expansion type, through LG brand of variable refrigerant (VRV) air condensing volume, in a cooling capacity of about 1.200 HP (960 TR).
Central air conditioning system installation, VRF system with nominal capacity of 432 HP, stairs pressurization system, air supply exhaustion outside toilets, ETE exhaustion and air conditioning of elevator machinery room.
Central air conditioning system installation, direct expansion, into VRF type with nominal capacity of 288 HP, pressurization system of stairs and outside air supply.
Central air conditioning system installation, with indirect expansion system with cold water nominal capacity of 130 TONS and outdoor air supply.
Central air conditioning system installation, indirect expansion, nominal capacity 1200 TONS, and direct expansion system, VRF with nominal capacity 10 HP, outdoor air supply and exhaust toilets.
Operation and service provision, preventive and corrective maintenance of air conditioning and ventilation systems, mechanical exhaust equipment, both belonging to the condominium and to many investors and proprietors.
Operation and service provision, preventive and corrective maintenance of air conditioning and ventilation systems, mechanical exhaust equipment, both belonging to the condominium and to many investors and proprietors.
Operation and service provision, preventive and corrective maintenance of air conditioning and ventilation systems, mechanical exhaust equipment, both belonging to the condominium and to many investors and proprietors.
Provision of operating services and building maintenance.
Provision of operating services, preventive and corrective maintenance of air conditioning and ventilation systems, as well as mechanical exhaust, electrical and building.
Provision of preventive and corrective maintenance of air conditioning and ventilation systems and mechanical exhaust.
Operation and service provision, preventive and corrective maintenance of air conditioning and ventilation systems, mechanical exhaust equipment, both belonging to the condominium and to many investors and proprietors.
Design and installation of central air conditioning systems, using central chilled water from Hitachi, with cooling capacity of 100 TONS chillers with water provided with screw-type compressors and microprocessor.
Installation of ten (10) units of air-conditioners Fan coil type, with different cooling capacities, controlled temperature and air relative humidity.
Installed multiple split-system units from Hitachi and mechanical ventilation systems.
Central Modification and installation of cold water sustem in the building at Av. President Wilson, 142, with a 400 TONS cooling capacity, using two centrifugal YORK units.
Installation of ten (10) units of air-conditioners, Fan coil units with nominal capacity of 25 TONS cooling each.
Installed 01 (one) water cooling tower, 400 TONS.
Central air conditioning system installation for the building at São Francisco Xavier Street, 603, a 70 TONS cooling capacity, using self-contained units.
Central air conditioning system installation indoor, Praia do Flamengo, 66, 4th floor, with a 70 TONS cooling capacity, using self-contained units.
Central air conditioning system installation for the building of the toll road BR-116, km 110.5, with 40 TONS cooling capacity, using self-contained units.
Central air conditioning system installation, with 10 TONS cooling capacity, according to the premises for retrofit operation in Rio de Janeiro Road Station.
Chilled water system installation, Teleport Building - RJ
Central air conditioning system installation, with temperature and humidity control, with total capacity of 18 TONS cooling.
Installation of special pipelines pumping compressors; exhaustion systems in diverse automobile and automotive gas (GLP, GNV) stations in Rio de Janeiro state.
Central air conditioning system installation, with a cooling capacity of 15TR for the administration at Avenida Brasil Km 50, Rio de Janeiro plant and facilities.
Installation of central air conditioning systems in different branches and zones in Rio de Janeiro. Vila Isabel, Recreio ndos Bandeirantes, Ipanema, Barra, Botafogo and Tijuca (45 TONS, each).
Central air conditioning system installation, 60 TONS cooling capacity and mechanical exhaust for toilets.
Central air conditioning system remodelation - 40 TONS installed.
Chilled water system installation, 50 TONS (SUMMIT-99)
Air conditioning installation of RT 30, to Isotonic plant in Areal / RJ.
Central air conditioning system installation - 50 TONS.
Central air conditioning system installation with self-contained microprocessor unit 15 TONS.
Design and central air conditioning system installation to the Auditorium - 30 TONS.
Installation of diverse air conditioning systems - 30 TONS.
Replacement of central air conditioning system on several floors - 110 TONS.
General renovation project of the central air conditioning system - 120 TONS.
general renovation project of the central air conditioning system of the blocks A, B and C - Maracanã Unit - 350 TONS.
General renovation project for central air conditioning system - TONS 150.
Central air conditioning system design - 150 TONS.
Central air conditioning system design - 150 TONS.
Design and central air conditioning system installation, VRF model, in the new building of the Vocational Training Centre in Macae - 300 TONS.
Design and central air conditioning system installation for the new building of the Vocational Training Center Jacarepagua - 300 TONS.
Design and central air conditioning system reform Installation of the 7th and 8th floors - 400 TONS.
Supplying and new chiller installation with screw compressor, using ecological gas; 180 TONS and overhaul of compressors in existing chillers.
Design and new air conditioning system installation for the 5th, 6th, 7th and 8th floors in headquarters, Rio de Janeiro, located at Praia de Botafogo, 370.
Adaptations of pipeline ducties improving processing inside rooms of Corporate University in Centro Empresarial Rio, Building Argentina. 228 Praia de Botafogo Avenue.
Design and central air conditioning system installation; indirect expansion with composite chilled water system. Capacity, 150 TONS.
Design and central air conditioning system installation. VRF MODEL for the new building. 1000 HP power.
Design and installation of central air conditioning system, VRF, 60 HP.
Design and central VRF air conditioning system installation, 48 HP.
Design and central VRF air conditioning system installation. Rio de Janeiro - 24 HP.
Design and installation of central air conditioning system, MULTIZONE, 15 HP
Design and central VRF air conditioning system installation, direct expansioned type, as renovation of the building of the Post Office, with nominal capacity of 220 HP, outdoor air supply system and toilets exhaustion.
Central air conditioning system; designed with indirect expansion type for the new building of Manguinhos CDHS. Nominal capacity of 430 TONS, outdoor air supply system and exhaustion for toilets.
Central air conditioning system installation of chilled water type - TONS 375.
Central air conditioning system maintenance - 500 TONS.
Design of air conditioning system
Design of air conditioning system
Design and installation of air conditioning system
Design and installation of air conditioning system - 50 TONS
Design and installation of air conditioning system
MSTC Engenharia was contracted in 2017 to perform corrective services in the air conditioning, ventilation and mechanical exhaustion equipments of Viena Restaurants in Barra Shopping and Plaza Niterói (IMC - INTERNATIONAL MEAL COMPANY).
Installation of central air conditioning system - 20 TONS
Central air conditioning system installation, Shopping Garden Bar
Installation of central air conditioning system - 25 TONS
Installation of central air conditioning system - 15 TONS
West Shopping, Rua do Ouvidor, Vitória
Air conditioning system installation, Shoppings Fashion Mall and Forum de Ipanema.
Installation of central air conditioning system - 20 TONS
Installation of central air conditioning system - 20 TONS
Installation of central air conditioning system - 20 TONS
Installation of central air conditioning system - 25 TONS
System, several projects of central air conditioning and mechanical exhaust systems:: CFP (MACAÉ), CFP (JACAREPAGUÁ), ISES (UNOP TIJUCA), OFICINA DE OURIVESARIA (UNOP TIJUCA), AUDITÓRIO (CAT CAMPOS), SESI (BINGEN), SESI (RUA IPIRANGA), SESI (BONSUCESSO), CPD CENTRAL (FIRJAN), SESI (RESENDE), AUDITORIO (UNOP TIJUCA), SESI (PACIÊNCIA), ALMOXARIFADO E PREDIO ADM (SENADOR ALENCAR), SESI (JACAREPAGUA), SESI (NITERÓI),etc.
Installation of central air conditioning system - 40 TONS - Copacabana agency
Installation of central air conditioning system - 20 TONS - Candelária agency
Installation of central air conditioning system - 30 TONS - Downtown agency
Installation of central air conditioning system - 20 TONS - Humaitá agency
Installation of several central air conditioning systems: Nova Iguaçu branch, Botafogo branch, Flamengo branch, etc.
Central air conditioning system installation for reforming capacity of Central Laboratory, 200 TONS
Installation of several central air conditioning systems: Tijuca branch, Leblon e Belo Horizonte (MG).
Central air conditioning system installation, in ew headquarters. Business Center CITTÁ AMERICA, Rio de Janeiro.
Installation of mechanical exhaust plumbing system.
Air conditioning system installation for Data Processing Center on Flamengo Beach, 154, 5.andar. e SET Free Hitachi, with monitoring via CSNET.
Central air conditioning system with reform project in several stores in Rio de Janeiro, such as Copacabana, Rio Branco Downtown, Ouvidor Downtown, Sete de Setembro Downtown, Botafogo, Plaza Shopping Niterói, Norte Shopping, North Zone.
Provision of contract installation services, preventive and corrective maintenance of various stations belonging to Oi (Telemar). Cidade Nova, São Conrado, Flamengo, Cidade de Deus, Jacarepagua, Barra da Tijuca, Ipanema, Leme, Botafogo, Leblon, Nova Iguaçu , São João de Meriti, Arcos.
Additional system installation, air conditioning VRF device in Oi building in Rio de Janeiro center, 60 HP capacity, monitored via CSNET.
Retrofit and complete reformation, including general air conditioning system in the Mall, providing technical responsibility services for the air conditioning system (total volume 750 TONS), covering corrective services chillers / towers and electrical panels; Production and monitoring of PMOC, official document declaring technical responsibility about the equipment facilities.
Design, project and central VRF air conditioning system installation, to supply one of the main buildings in Universidade Veiga de Almeida - 232 HP.
Central air conditioning system installation. Indirect expansion model for general reformation of Sala Cecilia Meireles, with nominal capacity of 200 TONS.